NETRESEC Network Security Blog - Tag : C2

rss

QakBot C2 Traffic

In this video I analyze network traffic from a QakBot (QBot) infection in order to identify the Command-and-Control (C2) traffic. The analyzed PCAP file is from malware-traffic-analysis.net.

IOC List

  • C2 IP and port: 80.47.61.240:2222
  • C2 IP and port: 185.80.53.210:443
  • QakBot proxy IP and port: 23.111.114.52:65400
  • JA3: 72a589da586844d7f0818ce684948eea
  • JA3S: ec74a5c51106f0419184d0dd08fb05bc
  • JA3S: fd4bc6cea4877646ccd62f0792ec0b62
  • meieou.info X.509 cert hash: 9de2a1c39fbe1952221c4b78b8d21dc3afe53a3e
  • meieou.info X.509 cert Subject OU: Hoahud Duhcuv Dampvafrog
  • meieou.info X.509 cert Issuer O: Qdf Wah Uotvzke LLC.
  • gifts.com X.509 cert hash: 0c7a37f55a0b0961c96412562dd0cf0b0b867d37
  • HTML Body Hash: 22e5446e82b3e46da34b5ebce6de5751664fb867
  • HTML Title: Welcome to CentOS

Links

For more analysis of QakBot network traffic, check out my Hunting for C2 Traffic video.

Posted by Erik Hjelmvik on Thursday, 02 March 2023 12:43:00 (UTC/GMT)

Tags: #QakBot#QBot#C2#Video#malware-traffic-analysis.net#ThreatFox#ec74a5c51106f0419184d0dd08fb05bc#fd4bc6cea4877646ccd62f0792ec0b62#CapLoader#NetworkMiner

Short URL: http://netresec.com/?b=233eaa1


Emotet C2 and Spam Traffic Video

This video covers a life cycle of an Emotet infection, including initial infection, command-and-control traffic, and spambot activity sending emails with malicious spreadsheet attachments to infect new victims.

The video was recorded in a Windows Sandbox in order to avoid accidentally infecting my Windows PC with malware.

Initial Infection

Palo Alto's Unit 42 sent out a tweet with screenshots and IOCs from an Emotet infection in early March. A follow-up tweet by Brad Duncan linked to a PCAP file containing network traffic from the infection on Malware-Traffic-Analysis.net.

Screenshot of original infection email from Unit 42

Image: Screenshot of original infection email from Unit 42

  • Attachment MD5: 825e8ea8a9936eb9459344b941df741a

Emotet Download

The PCAP from Malware-Traffic-Analysis.net shows that the Excel spreadsheet attachment caused the download of a DLL file classified as Emotet.

CapLoader download of Emotet DLL from diacrestgroup.com

Image: CapLoader transcript of Emotet download

  • DNS: diacrestgroup.com
  • MD5: 99f59e6f3fa993ba594a3d7077cc884d

Emotet Command-and-Control

Just seconds after the Emotet DLL download completes the victim machine starts communicating with an IP address classified as a botnet command-and-control server.

Emotet C2 sessions with JA3 51c64c77e60f3980eea90869b68c58a8 in CapLoader

Image: Emotet C2 sessions in CapLoader

  • C2 IP: 209.15.236.39
  • C2 IP: 147.139.134.226
  • C2 IP: 134.209.156.68
  • JA3: 51c64c77e60f3980eea90869b68c58a8
  • JA3S: ec74a5c51106f0419184d0dd08fb05bc
  • JA3S: fd4bc6cea4877646ccd62f0792ec0b62

Emotet Spambot

The victim PC eventually started sending out spam emails. The spam bot used TLS encryption when possible, either through SMTPS (implicit TLS) or with help of STARTTLS (explicit TLS).

Emotet spambot JA3 hash 37cdab6ff1bd1c195bacb776c5213bf2 in NetworkMiner Professional

Image: Emotet spambot JA3 hash in NetworkMiner Professional

  • SMTPS JA3: 37cdab6ff1bd1c195bacb776c5213bf2
  • STARTTLS JA3: 37cdab6ff1bd1c195bacb776c5213bf2

Transmitted Spam

Below is a spam email sent from the victim PC without TLS encryption. The attached zip file contains a malicious Excel spreadsheet, which is designed to infect new victims with Emotet.

Emotet spam email from PCAP

Image: Spam email extracted from Emotet PCAP with NetworkMiner

  • .zip Attachment MD5: 5df1c719f5458035f6be2a071ea831db
  • .xlsm Attachment MD5: 79cb3df6c0b7ed6431db76f990c68b5b

Network Forensics Training

If you want to learn additional techniques for analyzing network traffic, then take a look at our upcoming network forensic trainings.

Posted by Erik Hjelmvik on Monday, 09 May 2022 06:50:00 (UTC/GMT)

Tags: #Emotet#C2#video#pcap#JA3#JA3S#51c64c77e60f3980eea90869b68c58a8#ec74a5c51106f0419184d0dd08fb05bc#fd4bc6cea4877646ccd62f0792ec0b62#SMTP#SMTPS#Windows Sandbox#videotutorial​

Short URL: http://netresec.com/?b=225196a


How the SolarWinds Hack (almost) went Undetected

My lightning talk from the SEC-T 0x0D conference has now been published on YouTube. This 13 minute talk covers tactics and techniques that the SolarWinds hackers used in order to avoid being detected.

Video: Hiding in Plain Sight, How the SolarWinds Hack went Undetected

Some of these tactics included using DNS based command-and-control (C2) that mimicked Amazon AWS DNS traffic, blending in with SolarWind’s legitimate source code and handpicking only a small number of targets.

One thing I forgot to mention in my SEC-T talk though, was the speed at which the attackers were working to analyze incoming data from the trojanized installs and selecting organizations to target for stage two operations.

SolarWinds Hack Timeline

For example, just during June 2020 the attackers got more than 1300 new organizations that started beaconing in using the DNS-based C2. The beaconed data only included the organizations’ Active Directory domain name and a list of installed security applications. Based on this information the attackers had to decide whether or not they wanted to target the organization. We have previously estimated that less than 1% of the organizations were targeted, while the malicious backdoor was disabled for all the other 99% who had installed the trojanized SolarWinds Orion update.

SolarWinds C2 IP addresses

The attackers typically decided whether or not to target an organization within one week from when they started beaconing. This means that the attackers probably had several hundred organizations in queue for a targeting decision on any given week between April and August 2020. That's a significant workload!

Posted by Erik Hjelmvik on Monday, 18 October 2021 10:30:00 (UTC/GMT)

Tags: #SolarWinds#SEC-T#video#backdoor#SUNBURST#Solorigate#STAGE2#Stage 2#DNS#C2#ASCII-art

Short URL: http://netresec.com/?b=21A27a0


Targeting Process for the SolarWinds Backdoor

The SolarWinds Orion backdoor, known as SUNBURST or Solorigate, has been analyzed by numerous experts from Microsoft, FireEye and several anti-virus vendors. However, we have noticed that many of the published reports are either lacking or incorrect in how they describe the steps involved when a client gets targeted by the threat actors. We have therefore decided to publish this writeup, which is based on the analysis we did of the SolarWinds backdoor when creating our SunburstDomainDecoder tool.

UPDATE March 1, 2021

Fixed errors in the Stage 2 beacon structure and added a CyberChef recipe link.

avsvmcloud.com DNS queries are not DGA related

The DNS communication between the backdoored SolarWinds Orion clients and the authoritative name server for avsvmcloud.com is not caused by a Domain Generation Algorithm (DGA), it's actually a fully functional two-way communication C2 channel. The clients encode information, such as the internal AD domain and installed security applications into the DNS queries and the DNS responses from the name server are used to instruct the clients to continue beaconing, stop beaconing or to target a client by proceeding to what we call Stage 2 operation. Thus, the authoritative name server for avsvmcloud.com was actually the C2 server for Stage 1 and 2 operation of the SolarWinds backdoor.

SolarWinds Backdoor State Diagram

Image: SolarWinds Backdoor State Diagram

Command: Continue Beaconing

The default response from the name server is the "Continue Beaconing" command, which indicates that the threat actors have not yet decided if the SolarWinds client is of interest for further activity. Receiving a DNS A record in any of the following net ranges instructs the SolarWinds backdoor to continue beaconing:

  • 8.18.144.0/23
  • 71.152.53.0/24
  • 87.238.80.0/21
  • 199.201.117.0/24

In "Stage 1" operation the SUNBURST client starts out in the "New" mode where it exfiltrates the internal AD domain name. The AD domain data is often split into multiple DNS queries to reduce the length of each DNS query. The client later proceeds to the "Append" mode when the full AD domain has been exfiltrated. In "Append" mode the client transmits a list of installed or running security applications to the DNS C2 server, as we have described in our Extracting Security Products from SUNBURST DNS Beacons blog post. The client remains in Append mode until it gets either terminated or targeted.

Note: It is also possible to reset a client back to the "New" mode with a so-called "Ipx" command, but that is out of scope for this blog post.

Command: Stop Beaconing

The stop beaconing command terminates the DNS beaconing, so that the client no longer retrieves any commands from the C2 server. The C2 communication is stopped after receiving a DNS DNS A or AAAA record in any of the following ranges:

  • 20.140.0.0/15
  • 96.31.172.0/24
  • 131.228.12.0/22
  • 144.86.226.0/24
  • 10.0.0.0/8
  • 172.16.0.0/12
  • 192.168.0.0/16
  • 224.0.0.0/3
  • fc00:: - fe00::
  • fec0:: - ffc0::
  • ff00::

Command: Target Client

A SUNBURST client that has been "targeted" will change a flag called rec.dnssec in the source code from false to true. We call this flag the "Stage 2" flag, which must be set in order for the client to accept a CNAME record and proceed to Stage 3. Symantec refer to the Stage 2 flag as "a bit flag representing whether the previous DNS response successfully contained partial or full instructions to start the secondary HTTP communication channel".

A DNS A record in any of the following three IP ranges can be used to set the "Stage 2" flag:

  • 18.130.0.0/16
  • 99.79.0.0/16
  • 184.72.0.0/15

The state of the Stage 2 flag is actually signaled in the avsvmcloud.com DNS queries, which is how we managed to identify the AD domains of 23 targeted organizations just by analyzing SUNBURST DNS queries.

Stage 2 DNS Request Structure

The structure of the SUNBURST DNS queries in Stage 1 is pretty well described by Prevasio and Symantec, so we will not cover those in this blog post. Instead we will focus specifically on the structure of the DNS queries transmitted in Stage 2 operation, where the clients request a CNAME record from the name server.

As we have explained previously the exfiltrated data gets base32 encoded, using the custom alphabet "ph2eifo3n5utg1j8d94qrvbmk0sal76c", in order to ensure that only valid domain name characters are used in the DNS beacons.

The structure of the Stage 2 request, before it gets base32 encoded and appended as an avsvmcloud.com subdomain, looks like this:

Field Size Description
XOR Key 8 bits A value between 0x01 and 0x7F used to XOR encrypt the rest of the data.
GUID 64 bits Client ID encrypted using 16 bit rotating XOR with the last 15 bits of Timestamp and the Stage 2 flag.
Packet Type 4 bits A value of 0x1, could in theory be 0x2 but that's very unlikely.
Timestamp 19 bits Number of 30 minute periods since start of 2010 (UTC).
Stage 2 Flag 1 bit A flag set to "1" in Stage 2 operation, otherwise "0".
SolarWinds Backdoor Stage 2 DNS Beacon Structure

Image: Stage 2 beacon structure of the SolarWinds backdoor

The base32 encoding not only uses a custom alphabet, it also employs a reversed endianess and byte order compared to "normal" implementations. We have created a CyberChef recipe that performs this custom base32 decoding, so that the structure can be verified more easily. A list with 45 different Stage 2 avsvmcloud.com subdomains can be found in our Finding Targeted SUNBURST Victims with pDNS blog post. Feel free to replace the input to our CyberChef recipe with any of those subdomains.

Sleep Timers

The DNS responses from the name server not only controls how the SolarWinds backdoor should transition between the various stages, it also controls for how long the backdoor should wait before sending the next DNS beacon.

The delay is assigned by AND-ing the last octet of the received IP address with bitmask 0x54. The result from the AND operation is then used to select a sleep interval in the table below, within which the client picks a random number of minutes to sleep.

AND Result Name Sleep Interval
0x00 1 hour 30-120 minutes
0x04 4 hours 240-300 minutes
0x10 8 hours 480-600 minutes
0x14 1 day 1440-1560 minutes
0x40 3 days 4320-5760 minutes
0x44 1 week 10020-10140 minutes
0x50 2 weeks 20100-20220 minutes
0x54 1 month 43140-43260 minutes

An exception to the table above is clients that have entered Stage 2, which will only wait one to three minutes before requesting a CNAME.

Example DNS C2 for a Non-Targeted Client

Below is an example of DNS queries and responses from a SUNBURST client that wasn't targeted by the threat actors. These particular queries and responses come from a post on SolarWinds' community forum.

  • 2020-07-04 00:03 UTC
    Query: if9prvp9o36mhihw2hrs260g12eu1 ⇒ AD domain "omeros.local"
    Response: 8.18.145.139 ⇒ sleep 1h, then Continue
  • 2020-07-04 01:08 UTC
    Query: hnhb3v1b37dvv09icg0edp0 ⇒ Carbon Black is running
    Response: 8.18.145.62 ⇒ sleep 1 day, then Continue
  • 2020-07-05 01:15 UTC
    Query: ea99hr2sfen95nkjlc5g ⇒ Nothing new to report
    Response: 8.18.144.150 ⇒ sleep 1 day, then Continue
  • 2020-07-06 02:42 UTC
    Query: 707gigk9vbc923hf27fe ⇒ Nothing new to report
    Response: 8.18.145.151 ⇒ sleep 1 day, then Continue
  • 2020-07-07 03:52 UTC
    Query: 6eivqct649pcg0g16ol4 ⇒ Nothing new to report
    Response: 20.140.84.127 ⇒ Stop DNS beacon

Note: Queried domain names in this list are subdomains of appsync-api.eu-west-1.avsvmcloud.com.

Example DNS C2 for a Targeted Client

Disclaimer: We have very few DNS queries and responses for targeted victims, hence the transactions below are improvised based on data from VriesHd, Joe Słowik and FireEye. Please view these transactions as an example of what the communication might look like for a targeted victim rather than what actually happened to this particular target.

  • 2020-06-11 04:00 UTC
    Query: r8stkst71ebqgj66ervisu10bdohu0gt ⇒ AD domain, part 1 "central.pima.g"
    Response: 8.18.144.1 ⇒ Sleep 1h, then Continue
  • 2020-06-11 05:00 UTC
    Query: ulfmcf44qd58t9e82w ⇒ AD domain, part 2 "ov"
    Response: 8.18.144.2 ⇒ Sleep 1h, then Continue
  • 2020-06-11 06:00 UTC
    Query: p50jllhvhmoti8mpbf6p2di ⇒ Nothing to report
    Response: 8.18.144.16 ⇒ Sleep 8h, then Continue
  • 2020-06-11 14:00 UTC
    Query: (?) ⇒ Nothing new to report
    Response: 8.18.144.17 ⇒ Sleep 8h, then Continue
  • 2020-06-11 22:35 UTC
    Query: j5uqlssr1hfqnn8hkf172mp ⇒ Nothing to report
    Response: 184.72.181.52 ⇒ Target client for Stage 2 operation (1-3 minutes sleep)
  • 2020-06-11 22:37 UTC
    Query: 7sbvaemscs0mc925tb99 ⇒ Client in Stage 2 operation, requesting CNAME
    Response: deftsecurity.com ⇒ CNAME for Stage 3 HTTPS C2 server

Note: Queried domains in this list are subdomains of appsync-api.us-west-2.avsvmcloud.com.

Conclusions

We hope this blog post clears up any misunderstandings regarding the targeting process of the SolarWinds backdoor and highlights the significance of the Stage 2 flag.

We warmly welcome any feedback or questions you might have regarding this writeup, please feel free to contact us or reach out to us through Twitter.

Posted by Erik Hjelmvik on Wednesday, 17 February 2021 20:22:00 (UTC/GMT)

Tags: #SolarWinds#backdoor#SUNBURST#Solorigate#FireEye#Microsoft#CNAME#STAGE2#Stage 2#DNS#avsvmcloud.com#C2#CyberChef#ASCII-art

Short URL: http://netresec.com/?b=212a6ad


Finding Targeted SUNBURST Victims with pDNS

Our SunburstDomainDecoder tool can now be used to identify SUNBURST victims that have been explicitly targeted by the attackers. The only input needed is passive DNS (pDNS) data for avsvmcloud.com subdomains.

Companies and organizations that have installed trojanized a SolarWinds Orion update containing the SUBURST backdoor will send DNS queries for seemingly random subdomains of avsvmcloud.com. Some of these DNS queries actually contain the victim's internal AD domain encoded into the subdomain, as explained in our blog post Reassembling Victim Domain Fragments from SUNBURST DNS.

Three Stages of SUNBURST Backdoor Operation

Most SUNBURST victims were luckily not targeted by the attackers. This means that the backdoor never made it past "STAGE1" of the infection process. Nevertheless, the attackers did choose to proceed to "STAGE2" with some victims. As explained in FireEye's blog post SUNBURST Additional Technical Details, the "C2 coordinator" can proceed to the next stage by responding with a DNS A record pointing to an IP address within any of these three ranges:

  • 18.130.0.0/16
  • 99.79.0.0/16
  • 184.72.0.0/15

According to FireEye's "Diagram of actor operations and usage of SUNBURST", the decision to proceed to the next stage is based upon whether or not the victim's internal AD domain is "interesting to attack".

Note: "STAGE2" is referred to as "associated mode" in FireEye's blog post.

SUNBURST backdoors that have entered STAGE2 will allow CNAME records in DNS responses to be used as new C2 domains.

Sunburst stages 1 to 3 (passive, associated and active)

We have discovered that the SUNBURST backdoor actually uses a single bit in the queried avsvmcloud.com subdomain in order to flag that it has entered STAGE2 and is accepting new C2 domains in CNAME records. This bit is called flag, ext or dnssec in the malicious SUNBURST implant and can be extracted from DNS queries that have an encoded timestamp, such as those indicating which security products that are installed.

Detecting STAGE2 DNS Requests

Our SunburstDomainDecoder tool has now been updated to include a "STAGE2" tag in the output for DNS queries containing this stage 2 flag. This means that organizations like national CERTs, who perform incident response coordination and victim notification, can now use SunburstDomainDecoder in order to identify and notify targeted SUNBURST victims that have entered STAGE2.

Here's the output we get when feeding SunburstDomainDecoder with Bambenek's uniq-hostnames.txt passive DNS data and only displaying lines containing "STAGE2":

SunburstDomainDecoder.exe < uniq-hostnames.txt | findstr STAGE2
22334A7227544B1E 2020-09-29T04:00:00.0000000Z,STAGE2 5qbtj04rcbp3tiq8bo6t
FC07EB59E028D3EE 2020-06-13T09:00:00.0000000Z,STAGE2 6a57jk2ba1d9keg15cbg
1D71011E992C3D68 2020-06-11T22:30:00.0000000Z,STAGE2 7sbvaemscs0mc925tb99
F90BDDB47E495629 2020-06-13T08:30:00.0000000Z,STAGE2 gq1h856599gqh538acqn
DB7DE5B93573A3F7 2020-06-20T02:30:00.0000000Z,STAGE2 ihvpgv9psvq02ffo77et
3C327147876E6EA4 2020-07-22T17:00:00.0000000Z,STAGE2 k5kcubuassl3alrf7gm3
3C327147876E6EA4 2020-07-23T18:30:00.0000000Z,STAGE2 mhdosoksaccf9sni9icp
1D71011E992C3D68 central.pima.gov,STAGE2
DB7DE5B93573A3F7 coxnet.cox.com,STAGE2,WindowsDefender
F90BDDB47E495629 central.pima.gov,STAGE2

Most of these subdomains are listed in FireEye's Indicator_Release_NBIs.csv file as having CNAME pointers to other SUNBURST C2 domains like: freescanonline[.]com, deftsecurity[.]com and thedoccloud[.]com. But the first domain, with GUID 22334A7227544B1E, was actually not part of FireEye's IOC data.

Even more STAGE2 domains and GUID values can be found by analyzing other passive DNS resources, such as this passive DNS dump on pastebin by Rohit Bansal.

curl -s http://pastebin.com/raw/6EDgCKxd | SunburstDomainDecoder.exe | findstr STAGE2
E258332529826721 2020-07-18T05:00:00.0000000Z,STAGE2 1dbecfd99ku6fi2e5fjb
2039AFE13E5307A1 2020-05-30T14:30:00.0000000Z,STAGE2 4n4vte5gmor7j9lpegsf
22334A7227544B1E 2020-09-29T04:00:00.0000000Z,STAGE2 5qbtj04rcbp3tiq8bo6t
FC07EB59E028D3EE 2020-06-13T09:00:00.0000000Z,STAGE2 6a57jk2ba1d9keg15cbg
1D71011E992C3D68 2020-06-11T22:30:00.0000000Z,STAGE2 7sbvaemscs0mc925tb99
1D71011E992C3D68 2020-06-11T22:30:00.0000000Z,STAGE2 7sbvaemscs0mc925tb99
F90BDDB47E495629 2020-06-13T08:30:00.0000000Z,STAGE2 gq1h856599gqh538acqn
F90BDDB47E495629 2020-06-13T08:30:00.0000000Z,STAGE2 gq1h856599gqh538acqn
DB7DE5B93573A3F7 2020-06-20T02:30:00.0000000Z,STAGE2 ihvpgv9psvq02ffo77et
DB7DE5B93573A3F7 2020-06-20T02:30:00.0000000Z,STAGE2 ihvpgv9psvq02ffo77et
3C327147876E6EA4 2020-07-23T18:30:00.0000000Z,STAGE2 mhdosoksaccf9sni9icp

After removing the domains already present in FireEye's IOC we're left with the following FQDN's that have been requested by SUNBURST backdoors in STAGE2:

  • 1dbecfd99ku6fi2e5fjb.appsync-api.us-east-1.avsvmcloud.com
  • 4n4vte5gmor7j9lpegsf.appsync-api.eu-west-1.avsvmcloud.com
  • 5qbtj04rcbp3tiq8bo6t.appsync-api.us-east-1.avsvmcloud.com

Update January 7, 2021

Paul Vixie kindly shared his SunburstDomainDecoder output on Twitter yesterday. Paul's results show that the victim with GUID FC07EB59E028D3EE, which corresponds to the "6a57jk2ba1d9keg15cbg.appsync-api.eu-west-1.avsvmcloud[.]com" CNAME entry in FireEye's IOC, was Pima County. This means that 3C327147876E6EA4 is the only GUID among the CNAME records published by FireEye that cannot yet be tied to a victim organization. Paul's data also reveals two new STAGE2 victim GUIDs (65A28A36F24D379D and 8D2267C5A00796DA).

Update January 12, 2021

With help of SunburstDomainDecoder 1.9 and passive DNS data from Dancho Danchev we've been able to verify that Palo Alto have installed the maliocous SUNBURST backdoor and that it entered into STAGE2 opreration on September 29, 2020. Palo Alto's CEO Nikesh Arora has confirmed that they were hit by SUNBURST (or "SolarStorm" as they call it).

Update January 25, 2021

On December 17 VriesHd tweeted a link to a Google Docs spreatsheet containing aggregated SUNBURST DNS request data.

Might be helpfull with the SolarWinds/SUNBURST data to combine one another, so here's all the data (subdomain, region, first seen date, decrypted DGA) that I'm personally aware of in a Google sheet atm. Feel free to comment with new or updated information

One month later VriesHd made some substatial additions to the "SB2" spreadsheet, which by then contained several new STAGE2 victims. We have since then actively been trying to reach out to the targeted organizations, either directly or through CERT organizations, who perform incident response coordination and help with the victim notification process. VriesHd's passive DNS collection has now been incorporated into the SUNBURST STAGE2 Victim Table below.

Targeted SUNBURST Victims

Here's a summary of the STAGE2 beacons from SUNBURST victims that can be extracted from publicly available data:

GUID avsvmcloud.com Subdomain Timestamp (UTC) AD Domain
FF1E34A864BCE106 dh1usc8287hr46bia74a 2020-05-14 14:30 nsanet.local
E5E2AD2B6DE697D6 70fov85qclvubqhf9vlh 2020-05-16 19:30 cisco.com
FF1E34A864BCE106 2die0g7i5kgkki628gaj 2020-05-18 11:30 nsanet.local
3E8DF7FF13FC8D38 7hpaqi751fqoei2fdv8m 2020-05-18 16:30 HQ.FIDELIS
FF1E34A864BCE106 tsem12v1rn620hatfol2 2020-05-20 14:30 nsanet.local
FF1E34A864BCE106 a0hmuoveln2400sfvf6n 2020-05-20 16:30 nsanet.local
0C1A5A27B297FE46 k0biaol9fc84ummfn7vi 2020-05-26 11:30 vgn.viasatgsd.com
A887B592B7E5B550 m4apr0vu9qnomtun3b9t 2020-05-26 20:00 WincoreWindows.local
2039AFE13E5307A1 4n4vte5gmor7j9lpegsf 2020-05-30 14:30 suk.sas.com
06A4EA63C80EE24A 9q5jifedn8aflr4ge3nu 2020-05-31 12:00 scc.state.va.us
9850F550BD1010F2 gth7uravpvaapoi86834 2020-05-31 20:00 lagnr.chevrontexaco.net
E5E2AD2B6DE697D6 8k56mm0b876uvf5e7rd3 2020-06-01 19:00 cisco.com
2039AFE13E5307A1 laog1ushfp80e3f18cjg 2020-06-03 01:30 suk.sas.com
06A4EA63C80EE24A ntlcvjpqc57t9kb8ac75 2020-06-03 23:30 scc.state.va.us
1D71011E992C3D68 7sbvaemscs0mc925tb99 2020-06-11 22:30 central.pima.gov
F90BDDB47E495629 gq1h856599gqh538acqn 2020-06-13 08:30 central.pima.gov
FC07EB59E028D3EE 6a57jk2ba1d9keg15cbg 2020-06-13 09:00 central.pima.gov
583141933D242B0D f25k66k5hu68fneu7ocd 2020-06-16 06:00 logitech.local
52CE2BAFD69B2D0E f2co92njkm9od5eu7btg 2020-06-16 18:30 fc.gov
FACC72E2207CD69F rkspr9a19fl8r5ipggi1 2020-06-17 01:00 fox.local
3256C1BCAF74B5FC p0a7jjdp4eq9o2vok1mt 2020-06-18 07:00 ng.ds.army.mil
92DC5436D54898CD lusq9mg6j1e3jii5f66o 2020-06-18 17:30 ddsn.gov
DB7DE5B93573A3F7 ihvpgv9psvq02ffo77et 2020-06-20 02:30 coxnet.cox.com
59956D687A42F160 o49qi0qbfm37o6jul639 2020-06-23 06:00 wctc.msft
123EDA14721C3602 p5iokg3v9tntqcbo77p2 2020-06-29 08:30 scc.state.va.us
123EDA14721C3602 84v0j8kkbvqf8ntt4o9f 2020-06-30 10:30 scc.state.va.us
2F52CFFCD8993B63 0tvuasje2vc2i2413m6i 2020-07-01 16:30 mgt.srb.europa*
65A28A36F24D379D 7u32o0m6ureci8h5eo6k 2020-07-02 01:00
2F52CFFCD8993B63 en1clufg22h2uca27ro3 2020-07-03 06:00 mgt.srb.europa*
2F52CFFCD8993B63 s2r15kp335mnlq65i6ce 2020-07-03 09:00 mgt.srb.europa*
DB4013DDA16F6A40 up1vj67jjj9tpvceu7ak 2020-07-08 01:00 los.local
123EDA14721C3602 l0vos8o9m5p3m8of7g96 2020-07-10 22:00 scc.state.va.us
E5E2AD2B6DE697D6 8kr7r16da442u75egv1s 2020-07-15 14:00 cisco.com
A13731B17632C726 ttj6cro8jm6cfma8noo7 2020-07-17 12:30 phpds.org
E5E2AD2B6DE697D6 gh1so69rl1sgrgf38gr5 2020-07-17 15:00 cisco.com
E258332529826721 1dbecfd99ku6fi2e5fjb 2020-07-18 05:00
123EDA14721C3602 epm95unblvj984s2ovqh 2020-07-22 11:00 scc.state.va.us
3C327147876E6EA4 k5kcubuassl3alrf7gm3 2020-07-22 17:00 corp.qualys.com
3C327147876E6EA4 mhdosoksaccf9sni9icp 2020-07-23 18:30 corp.qualys.com
F2C9AC93206ABF47 onpqb88oq440lq82p7lb 2020-07-24 05:00 jpso.gov
123EDA14721C3602 0qthjq50jbdvnjq16o8f 2020-07-27 17:00 scc.state.va.us
123EDA14721C3602 gu6r7k260p6afq3ticso 2020-07-28 17:30 scc.state.va.us
936F78AB73AA3022 i4d2krbn2f92jo3uj8r9 2020-08-04 05:00 ggsg-us.cisco.com
936F78AB73AA3022 et2gu9tg5ckrsvaj5bom 2020-08-05 06:00 ggsg-us.cisco.com
22334A7227544B1E 5qbtj04rcbp3tiq8bo6t 2020-09-29 04:00 paloaltonetworks*

SUNBURST STAGE2 Victim Table
Sources: John Bambenek, Joe Słowik, Rohit Bansal, Dancho Danchev , Paul Vixie, FireEye and VriesHd.

Identifying More SUNBURST STAGE2 Victims

Companies and organizations with access to more passive DNS resources will hopefully be able to use SunburstDomainDecoder to identify additional targeted SUNBURST victims that have progressed to STAGE2.

Download SunburstDomainDecoder

Our tool SunburstDomainDecoder is released under a Creative Commons CC-BY license, and can be downloaded here:

http://www.netresec.com/files/SunburstDomainDecoder.zip

You can also read more about SunburstDomainDecoder in our blog post Reassembling Victim Domain Fragments from SUNBURST DNS.

Posted by Erik Hjelmvik on Monday, 04 January 2021 21:11:00 (UTC/GMT)

Tags: #Netresec#pDNS#SUNBURST#SolarWinds#Solorigate#SunburstDomainDecoder#SolarStorm#STAGE2#avsvmcloud#C2

Short URL: http://netresec.com/?b=2113a6a


Extracting Security Products from SUNBURST DNS Beacons

The latest version of our SunburstDomainDecoder (v1.7) can be used to reveal which endpoint protection applications that are installed on trojanized SolarWinds Orion deployments. The security application info is extracted from DNS queries for "avsvmcloud.com" subdomains, which is used by SUNBURST as a beacon and C2 channel.

Here's an example showing that City of Kingston, Ontario, Canada were running Windows Defender on their trojanized SolarWinds deployment back in June:

C:\> SunburstDomainDecoder.exe < uniq-hostnames.txt | findstr F9A9387F7D252842
F9A9387F7D252842 2020-06-16T00:00:00.0000000Z,​WindowsDefender_RUNNING,WindowsDefender_STOPPED lt5ai41qh5d53qoti3mkmc0
F9A9387F7D252842 on.ca olc62cocacn7u2q22v02eu
F9A9387F7D252842 2020-06-17T00:00:00.0000000Z q94idf4sjbem0rait7gv
F9A9387F7D252842 city.kingston. r1qshoj05ji05ac6eoip02jovt6i2v0c
F9A9387F7D252842 city.kingston.on.ca

The "F9A9387F7D252842" value is the victim's unique SUNBURST GUID. See our blog post Reassembling Victim Domain Fragments from SUNBURST DNS for more info about how the GUID value is encoded into the DNS traffic.

You can also run SunburstDomainDecoder in Linux, with help of Mono, like this:

$ mono SunburstDomainDecoder.exe < uniq-hostnames.txt | grep 76330B4D49BF7EC4
76330B4D49BF7EC4 LABELMAR e8fh1ravufms0qpt00gudir2951udivf
>76330B4D49BF7EC4 2020-05-30T12:30:00.0000000Z,​ESET_RUNNING,ESET_STOPPED gp27ssesmvnpkgff7rc0eok
76330B4D49BF7EC4 nde5gaefm oiltaoj08jjd8h12vnr4tur5h
76330B4D49BF7EC4 LABELMARKET.ES

The file "uniq-hostnames.txt" is a publicly available SUNBURST passive DNS repository created by Bambenek Consulting.

Security Product Statistics

It is also possible to use the passive DNS data shared by Bambenek, Joe Słowik and others to compute statistics of which security products that are popular among SolarWinds' customers.

Application Count
Windows Defender 150
Windows Defender ATP 1
MS Azure ATP /
Defender for Identity
0
Carbon Black 21
CrowdStrike Falcon 25
FireEye 9
ESET 32
F-Secure 0
SUNBURST Security Applications Chart

It is worth mentioning that SUNBURST does not report status for several other major endpoint protection vendors, such as Kaspersky, McAfee, Symantec, Sophos or Trend Micro.

Download SunburstDomainDecoder

Our tool SunburstDomainDecoder is released under a Creative Commons CC-BY license, and can be downloaded here:
http://www.netresec.com/files/SunburstDomainDecoder.zip

You can also read more about SunburstDomainDecoder in our blog post Reassembling Victim Domain Fragments from SUNBURST DNS.

Posted by Erik Hjelmvik on Tuesday, 29 December 2020 09:38:00 (UTC/GMT)

Tags: #SunburstDomainDecoder#SUNBURST#SolarWinds#Solorigate#DNS#Windows Defender#Carbon Black#FireEye#ESET#F-Secure#C2#beacon

Short URL: http://netresec.com/?b=20C1c3b


Examining an x509 Covert Channel

Jason Reaves gave a talk titled “Malware C2 over x509 certificate exchange” at BSides Springfield 2017, where he demonstrated that the SSL handshake can be abused by malware as a covert command-and-control (C2) channel.

Jason Reaves presenting at BSides Springfield 2017

He got the idea while analyzing the Vawtrak malware after discovering that it read multiple fields in the X.509 certificate provided by the server before proceeding. Jason initially thought these fields were used as a C2 channel, but then realized that Vawtrak performed a variant of certificate pinning in order to discover SSL man-in-the-middle attempts.

Nevertheless, Jason decided to actually implement a proof-of-concept (PoC) that uses the X.509 certificate as a C2 channel. Jason’s code is now available on GitHub along with a PCAP file demonstrating this covert C2 channel. Of course I couldn’t resist having a little look at this PCAP file in NetworkMiner.

The first thing I noticed was that the proof-of-concept PCAP ran the SSL session on TCP 4433, which prevented NetworkMiner from parsing the traffic as SSL. However, I was able to parse the SSL traffic with NetworkMiner Professional just fine thanks to the port-independent-protocol-identification feature (a.k.a Dynamic Port Detection), which made the Pro-version parse TCP 4433 as SSL/TLS.

X.509 certificates extracted from PCAP with NetworkMiner
Image: X.509 certificates extracted from PCAP with NetworkMiner

A “normal” x509 certificate size is usually around 1kB, so certificates that are 11kB should be considered as anomalies. Also, opening one of these .cer files reveals an extremely large value in the Subject Key Identifier field.

X.509 certificate with MZ header in the Subject Key Identifier field

Not only is this field very large, it also starts with the familiar “4D 5A” MZ header sequence.

NetworkMiner additionally parses details from the certificates that it extracts from PCAP files, so the Subject Key Identifier field is actually accessible from within NetworkMiner, as shown in the screenshot below.

Parameters tab in NetworkMiner showing X.509 certificate details

You can also see that NetworkMiner validates the certificate using the local trusted root certificates. Not surprisingly, this certificates is not trusted (certificate valid = FALSE). It would be most unlikely that anyone would manage to include arbitrary data like this in a signed certificate.


Extracting the MZ Binary from the Covert X.509 Channel

Even though NetworkMiner excels at pulling out files from PCAPs, this is definitively an occasion where manual handling is required. Jason’s PoC implementation actually uses a whopping 79 individual certificates in order to transfer this Mimikatz binary, which is 785 kB.

Here’s a tshark oneliner you can use to extract the Mimikatz binary from Jason's example PCAP file.

tshark -r mimikatz_sent.pcap -Y 'ssl.handshake.certificate_length gt 2000' -T fields -e x509ce.SubjectKeyIdentifier -d proxyLoc(tcp).port==4433,ssl | tr -d ':\n' | xxd -r -p > mimikatz.exe

Detecting x509 Anomalies

Even though covert channels using x509 certificates isn’t a “thing” (yet?) it’s still a good idea to think about how this type of covert signaling can be detected. Just looking for large Subject Key Identifier fields is probably too specific, since there are other fields and extensions in X.509 that could also be used to transmit data. A better approach would be to alert on certificates larger than, let’s say, 3kB. Multiple certificates can also be chained together in a single TLS handshake certificate record, so it would also make sense to look for handshake records larger than 8kB (rough estimate).

Bro IDS logo

This type of anomaly-centric intrusion detection is typically best done using the Bro IDS, which provides easy programmatic access to the X.509 certificate and SSL handshake.

There will be false positives when alerting on large certificates in this manner, which is why I recommend to also check if the certificates have been signed by a trusted root or not. A certificate that is signed by a trusted root is very unlikely to contain malicious data.

Posted by Erik Hjelmvik on Tuesday, 06 February 2018 12:13:00 (UTC/GMT)

Tags: #malware#C2#SSL#TLS#certificate#NetworkMiner#PCAP#x509#X.509#PIPI#Bro#IDS#tshark

Short URL: http://netresec.com/?b=182e662


Detecting Periodic Flows with CapLoader 1.4

CapLoader 1.4 logo

I am happy to announce a new release of our super-fast PCAP handling tool CapLoader! One of the new features in CapLoader makes it even easier to detect malicious network traffic without having to rely on blacklists, such as IDS signatures.

The new version of CapLoader includes new features such as:

  • Services Tab (more details below)
  • Input filter to limit number of parsed frames
  • Flow Transcript in Hosts and Services tabs
  • Keyword filtering
  • Full filtering capability for all tabs
  • Wireshark style coloring of flows, services and hosts


Services Tab

The biggest addition to version 1.4 of CapLoader is the Services tab, which presents a somewhat new way of aggregating the flows found in a PCAP file. Each row (or “service”) in the services tab represents a unique combination of <Client-IP, Server-IP, Server-port and Transport-protocol>. This means that if a single host makes multiple DNS requests to 8.8.8.8, then all those flows will be merged together as one row in the services tab.

CapLoader Services tab showing DNS requests to 8.8.8.8

This view makes it easy to see if a host is frequently accessing a particular network service. CapLoader even shows if the requests are made with regular intervals, in which case we measure the regularity and determine the most likely period between connections. The idea for measuring regularity comes from Sebastian Garcia's Stratosphere IPS, which can identify botnets by analyzing the periodicity of flows going to a C2 server.


Malware Example: Kovter.B

Here's what the Services tab looks like when loading 500 MB of PCAP files from a network where one of the hosts has been infected with malware (Win32/Kovter.B).

CapLoader service ordered on regularity

The services in the screenshot are sorted on the “Regularity” column, so that the most periodic ones are shown at the top. Services with a regularity value greater than 20 can be treated as periodic. In our case we see the top two services having a regularity of 36.9 with an estimated period of roughly 6h 2min. We can visualize the periodic behavior by opening the flows for those two services in a new instance if CapLoader. To do this, simply select the two services' rows, right-click the PCAP icon (in the top-right corner) and select “Open With > CapLoader 1.4.0.0”

CapLoader Flows tab with periodicly accessed service

As you can see in the flows tab, these services are accessed by the client on a regular interval of about 6h 2min. Doing a flow transcript of one such flow additionally reveals that the payload seems suspicious (not HTTP on TCP 80).

CapLoader transcript of Kovter.B C2 attempt (hex)
Image: Kovter.B malware trying to communicate with a C2 server

The Kovter malware failed to reach the C2 server in the attempt above, but there is a successful connection going to a C2 server at 12.25.99.131 every 3'rd hour (see service number 8 in the list of the most periodically accessed services). Here's a flow transcript of one such beacon:

CapLoader Transcript of Kovter.B C2 traffic
Image: Kovter.B malware talking to C2 server at 12.25.99.131


Legitimate Periodic Services

Seven out of the 10 most periodically accessed services are actually caused by the Kovter malware trying to reach various C2 servers. The three most periodically accessed services that aren't malicious are:

  • Service #3 is a legitimate Microsoft service (SeaPort connecting to toolbar.search.msn.com.akadns.net)
  • Service #5 is a mail client connecting to the local POP3 server every 30 minutes.
  • Service #6 is Microsoft-CryptoAPI updating its Certificate Revocation List from crl.microsoft.com every 5 hours.


Signature-Free Intrusion Detection

As shown in this blog post, analyzing the regularity of services is an efficient way of detecting C2 beacons without having to rely on IDS signatures. This method goes hand-in-hand with our Rinse-Repeat Intrusion Detection approach, which can be used to find malicous network traffic simply by ignoring traffic that seems “normal”.


Credits

Several bugs have been fixed in CapLoader 1.4, such as:

  • Support for frames with Captured Length > Real Lenght (Thanks to Dietrich Hasselhorn for finding this bug)
  • Delete key is no longer hijacked by the “Hide Selected Flows” button (Thanks to Dominik Andreansky for finding this bug).
  • CapLoader GUI now looks okay even with graphics are scaled through "custom sizing". Thanks to Roland Wagner for finding this.


Downloading CapLoader 1.4

The regularity and period detection is available in our free trial version of CapLoader. To try it out simply grab a copy here:
http://www.netresec.com/?page=CapLoader#trial (no registration needed)

All paying customers with an older version of CapLoader can grab a free update to version 1.4 at our customer portal.


UPDATE June 2, 2016

We're happy to announce that it is now possible to detect Kovter's C2 communication with help of an IDS signature thanks to Edward Fjellskål. Edward shared his IDS signature "NT TROJAN Downloader/Malware/ClickFraud.Win32.Kovter Client CnC Traffic" on the Emerging-Sigs mailing list yesterday. We have worked with Edward on this and the signature has been verified on our Kovter C2 dataset.


UPDATE June 8, 2016

Edward Fjellskål's IDS signature "ET TROJAN Win32.Kovter Client CnC Traffic" has now been published as an Emerging Threats open rule with SID 2022861.

#alert tcp $HOME_NET any -> $EXTERNAL_NET any (msg:"ET TROJAN Win32.Kovter Client CnC? Traffic"; flow:established,to_server; dsize:4<>256; content:!"HTTP"; content:"|00 00 00|"; offset:1; depth:3; pcre:"/^[\x11\x21-\x26\x41\x45\x70-\x79]/R"; content:!"|00 00|"; distance:0; byte_jump:1,0,from_beginning,post_offset 3; isdataat:!2,relative; pcre:!"/\x00$/"; reference:url,symantec.com/connect/blogs/kovter-malware-learns-poweliks-persistent-fileless-registry-update; classtype:trojan-activity; sid:2022861; rev:1;)

Posted by Erik Hjelmvik on Monday, 23 May 2016 11:55:00 (UTC/GMT)

Tags: #CapLoader#PCAP#Periodicity#C2#beacon#Intrusion Detection

Short URL: http://netresec.com/?b=165bf7d

2015 September

CapLoader 1.3 Released